Project details
Complex challenges:
- Poor ground conditions during winter months.
- Enabling works to continue in peat soils during winter by managing the water table on site with a temporary holding pond and dewatering into the Awakeri channel.
- Design and the construction of recharge pits within narrow berm spaces.
- Preloading of platforms and monitoring movement of preload.
Location
180 Walters Road
Size
Stage 1: 6 lots, 0.1815ha
Stage 2: 49 lots, 2.1022ha
Client
Walter Estate Ltd
Schedule
February 2019 – August 2019 (Earthworks Contract Only), Civil Works Stage 1 due to commence on EPA approval.